Jeelek engineers had a busy week! We replaced this out-of-date busbar mains installation which supplies various locations on a local caravan and camping site. We fitted a new 3 phase 200amp MCCB Panel board, complete with a new 3-phase distribution board and new 3-phase 200amp Glasgow switch.
A lot of design and planning between Jeelek and our client went into this project, to allow for the least amount of power down-time for the electricity supply to the site. We had to ensure that certain areas of the site remained live throughout the changeover. This proved to be tricky, but with the right planning in place and an understanding client, everything went to plan.

This installation is now up to the current standard and is now future proofed and capable of handling and future expansion to the site.